A journal following the history, design, construction and operation of Bernard Kempinski's O Scale model railroad depicting the U. S. Military Railroad (USMRR) Aquia-Falmouth line in 1863, and other model projects.
©Bernard Kempinski All text and images, except as noted, on this blog are copyrighted by the author and may not be used without permission.
-----------------------------------------------------------------------------------------------------------------------------------------------------------------

December 11, 2011

It's a small world department

This was a weekend of unexpected guests and lots of work on the railroad.

Andrew running a train across the bridge.
On Saturday Andrew Evans and his mother, Elaine Evans, stopped by to visit the layout. Elaine is the landscape architect working with Alicia on the backyard landscape design and construction. Andrew is a professional BBQ chef that also is a suppressed model train enthusiast, among many other hobbies including large scale model rockets. He owns a BBQ restaurant in Easton, MD. He used to compete and judge professional BBQ contests and knows Dave Frary from IQ BBQ. He really enjoyed the layout. I offered to trade layout work for BBQ so we'll have to keep an eye on that.




On Sunday Doug and Gerry arrived for a work session. We also were graced with a surprise visit by Paul Dolkos and John King.  John lives in Boyds, MD and models the B&O in Winchester, VA in the 1950s. His layout was in MRP 2005.









Doug and Gerry hard at work putting their Harvard and MIT Post doc education to work.
Doug worked on the terrain on the south end of Brooke by Accokeek Creek. He spent a good deal of time trying to get the terrain contours "just" right. Gerry preferred to spike rail and he completed about 8 linear feet of spiking.  I worked on the tunnel portal area of the Brooke.
Testing clearances of the rock cut
Doug worked on the terrain at Brooke.
The sloped piece is to get a feel
for the original slope.






















































After my visitors left, I got a burst of energy and finished up the flat terrain along the Brooke scene. I cut a piece of hardboard to trim out the cut that Doug worked on. I glued it in and then spackled it off. Once that dries, I sand it and the rest of the fascia and give another coat.  That should do it for fascia.

This is an historic point in my layout history. This peninsula has been essentially unsceniced for the 9 years I have lived in this house.  It had supported three previous layouts but it never progressed past a plywood plain.

Testing out the look of the tunnel cut

Adding foam supports to help hold up the flat area.

Over view looking RR South at Brooke.

Gurin's Cut at Brooke

The hill behind Brooke helps hide the view of Falmouth from the far end
of the layout near Potomac Creek.

December 10, 2011

Central Vermont Backdrop

I visited Marty's layout last night to do some backdrop painting. The story of Marty's layout and how he converted a double deck to a single deck layout is contained on his blog    I posted a short video showing the backdrop with a bit of commentary. You can see it below. Marty has a fine layout in the making.

December 8, 2011

Decision Matrix - the 300th Post




A few years back I was having trouble deciding on what layout to build. I had a bunch of N Scale modules and was trying to build a double deck layout. I had all the bench work done, but in looking at it I knew something was wrong. So I took an idea from work and built a decision matrix to help me sort out my thinking. I published this in a article in Model Railroad Planning 2006. You can see a copy of it here. I have an archived copy of the former layout website here.

When I decided to stop building my DRGW Tennessee Pass layout, I redid the matrix and discovered that the C&O Mountain Sub layout actually fit my givens and druthers (G&D) better. That matrix wasn't published, but the C&O Mtn Sub scored a 103. I had become bored with the Tennessee Pass layout by then, so I welcomed the change and started building the C&O Mountain Sub layout using my existing modules as a start. That layout was in Great Model Railroads 2011.

I have already related how I decided to switch to the USMRR Aquia line earlier in the first posts to this blog. But I never did a design matrix for it. Yesterday, Marty McGuirk was cleaning out old emails and sent me a copy of the C&O Matrix with a jibe that I should tear out the USMRR and go back to the C&O since it had the highest rating. That got me thinking, how would the USMRR Aquia Line score on the matrix, using the same criteria.

So I redid the matrix comparing the USMRR to the three previous layouts I was building in this house. Turns out, the USMRR scored highly, but not as high as the C&O Mountain sub. But it soundly beat both of the DRGW layouts.

This doesn't mean I am going to tear out the USMRR layout. The matrix is a decision aid and not a hard and fast rule. One of the most useful things you can do with the matrix is a sensitivity study. That is where you vary your G&Ds and weightings to see what how things compare.

I scored the USMMR a 2 for manageable  instead of a three because the wiring and track are simple, but I have to scratch build it all. If I had scored it a 3 the USMRR would have come out on top. The USMRR has the best waterfront design of any layout I considered. The others don't have a waterfront, but there were other plans I considered that did, so it is not a goofy as it looks. 

 I gave the USMRR a high score on big steam, not because it has C&O 2-6-6-6 H-8s and K4s but because the SMR 4-4-0s are big, beautiful and sound great. If I threw in battery power (assuming it works) then I'd add points for manageable and big steam.  I gave the USMRR 3 points for prototype modeling because of the information available at the National Archive. I would never have such good data on the C&O, and I had even less on the DRGW.

I could also change the G&Ds. When I built the matrix I was mostly comparing N scale layouts to each other. I did not look at different scales. Thus, the opportunity for figure modeling that O scale provides was not even a consideration in N scale. If I were starting from scratch, I'd add a G&D for figure modeling and that would tip the USMRR to the top. I could also add a G&D for the military modeling tie in. But if I did that now people would say I was cooking the books like a good beltway bandit.

So, it was a fun exercise.

As to swapping prototypes again, given that I am 55 years old and this project will take another 5 years, I probably won't build another "lifetime" layout. My next layout projects will be smaller, similar to British exhibition layouts. Some subjects I want to pursue once the Aquia line is "done" include a 1920s era steel mill in HO or P48. I also am intrigued by the idea of a Russian Front WWII depot in P48 using US Lend Lease equipment as well as Russian motive power (see the movie "Ballad of a Soldier" for inspiration.) It would feature some of the cool Tamiya 1/48th scale armor models now coming out. It would include an urban scene, perhaps battle damaged.

I just noticed that this is the 300th post to the blog. Amazing. Congrats to those to you that have stuck it out with me this long.

December 5, 2011

The future of model railroad is .....


....here now.

Over the past few years as I have been working and test operating my layout, dealing with shorts,  dealing with dirty track, and having to engineer reverse loops and frog power, I thought, "when are we going to drop this archaic system and go to battery power?"

Well, the answer is now.

This weekend, in a discussion with Ted Pamperin, he alerted me to the availability of the Stanton Radio Cab DCC system with battery pack. I had looked at it a few months ago, but because the NWSL's web site, the company that is offering the system, was so hard to use with broken and circular links, I could not tell if it was for sale.  Now, I confirmed that it is for sale. Today I ordered a starter bundle with a lithium-polymer (li-po) battery system.


I plan to overlay this on my Easy DCC system and use the 15V from the DCC system as a trickle charge. If the radio-battery system works as advertised, I'll convert the whole fleet to radio-battery control. At that point, my Easy DCC system would be come a bit overkill, as all I would need is a 15V DC source on the rails. But I can keep it for use on my N Scale DCC equipment.

If you need convincing about this system, check out this video.


I think that this type of system, as it comes down in price and becomes ready installed will lead to a new revolution in model railroading. If I was a DCC manufacturer, I'd be looking into this.

I also received my Christmas present today, the Model Railroader 75-Year Collection DVD. This is another move toward the future. But in this case, it looks like the future must wait. My disks were damaged during shipping and they won't install. I called Kalmbach customer service and they are sending replacements. They said they had a lot of trouble with disks 1 and 2 in the way they are packaged in the case.  I hope the replacements work.

In a triple play, I also received a review copy of The Iron Way, by William Thomas. I'll post a full review once I read it. Thanks to Ivan Lett at the Yale University Press for the copy.

December 4, 2011

Inspection Trip to NJ Model Railroads

Sewell, WV on Ted Pamperin's layout
With the quiet that accompanies winter quarters on the Aquia Line, Pvt Martin McGuirk accompanied BG Kempinski on a two day inspection trip of the railroads in New Jersey. The objective of the trip was to visit various railroads to learn the latest techniques in railroad technology and design. The culmination of the trip was an operating session on Tony's Koester's Third Sub of the Nickel Plate Railroad  where we experienced the latest in Train Order and Time Table Operation.  All in all it was a great trip. We got to see 4 great layouts and operate on one of them.
Mike's shelf fascia under St Johnsberry

Our first stop was at Mike McNamara's Northern Kingdom Layout. Although situated in southern New Jersey, Mike models the area in and around St Johnsberry, VT. For more information about his layout see his blog. His layout set in the 1980s features beautiful fall scenery complemented by the colorful diesels of five different railroads. Mike builds a shelf into his fascia with clear pine creating a very pleasing "furniture" look to his benchwork. 


St Mary's Yard
(L to r) Marty, Perry, Tony
The next stop was at Perry Squire's 1920s era Pittsburgh and Shawmut line. This gorgeous railroad is set in the 1920s and features numerous prototypically correct steam engines, structures and layout design. Perry was recovering from shoulder surgery, but he graciously allowed us to visit.

The scene at the left is St Mary's yard on Perry's layout. This is as fine a scene as you will find on any model railroad. 

Ted and Marty by Sewell
Thurmond on Ted's Layout
Third stop was Ted Pamperin's C&O New River and Alleghany Subdivision layout. Ted set his layout in winter and his mountain scenery just nailed it. His version of Sewell is the best I have seem. He also has a great representation of Thurmond that incorporates the Loup Creek branch as an active Branch. This is very hard to do, but Ted's design accomplishes it. As a bonus, Ted's layout features an upper level that models the Mann's Creek narrow gauge RR.

Tony briefs the crew at the start of the session.
Eric Hansman at one of the operator's stations
After a great dinner with Ted and Tony, Pvt McGuirk and I went to Tony's layout to get an hour long orientation and inspection.

On Sunday morning, after morning physical training (at least for me, Marty stayed in bed and watched "Hell on Wheels" on AMC), we met some of Tony's operating crew at the Andover diner for a big breakfast.

Then it was off to Tony's for an intense and enjoyable 4.5 hour long operating session.  Tony built the huge double deck design especially to allow his collection of NKP steam engines to reach speeds that are normally never seen on operating scale model railroads.  They didn't call it "High Speed Service" for nothing.

It was a toot operating the layout, literally, as the dozen or so grade crossings, meets and station required near constant use of the horns.

This is a layout of incredible scope and execution. It is amazing. We had 25 operators in Tony's basement and everybody was busy.  I always admire guys that take on such large projects and Tony is pulling it off.
That is Frankfort yard. Yes, it is about 60 feet long.
Marty proudly wearing his USMRR T Shirt

On our drive back to Virginia, we contemplated what we saw, heard and did. We had a great time. We both were re-energized to get our layouts going, confident that the layout choices we made for ourselves are just right. I look forward to a return trip to NJ in a few years to watch as these amazing layout progress.