A journal following the history, design, construction and operation of Bernard Kempinski's O Scale model railroad depicting the U. S. Military Railroad (USMRR) Aquia-Falmouth line in 1863, and other model projects.
©Bernard Kempinski All text and images, except as noted, on this blog are copyrighted by the author and may not be used without permission.
-----------------------------------------------------------------------------------------------------------------------------------------------------------------

March 27, 2013

So that's what barn red looks like!?

I fired up the laser tonight to cut some of the parts for the engine house. I decided to go with a single stall house. I used the engine house at City Point as a guide, but obviously with two less stalls, and only one engine deep. I laser cut the frames from my usual 1/8th inch aspen plywood. I also used some 1/4 inch stock for foundation beams, and some 1/16 basswood for the vents in the roof top monitor.  I painted the laser cut frames various shades of tan and khaki to disguise the laser burn marks.


Then I cut some sheets of scribed board and batten basswood  for the siding. They went on fairly easily. So I decided to give the siding a shot of Mt Albert Barn Red alcohol stain. I had purchased this  a few years ago and never had an opportunity to use it. I thought it could work on this building.  After brushing it on, I was not happy how it came out. First, I had some glue stains on the siding that prevented even absorption. It also accentuated the grain across several boards, and thus one could tell this was scribed siding and not individual boards. So I got out the airbrush and hit the siding with thin coats of Vallejo Hull Red, Black Grey, Black and Sand. I think I'll let it dry over night and see how it looks.


I may have to repaint it if it doesn't lighten a bit overnight as the alcohol dye evaporates. This photo by Paul Ward shows a barn with a red finish similar to the paint job I ended up getting. Looks like some gray drybrushing might help my model. But  the black air brushed stains look alike.

By the way, if you haven't try Vallejo airbrush paint, you should. It is the best air brush paint I have tried. The best feature is that it doesn't clog the air brush, plus it dries flat and covers well.



March 26, 2013

Road Show Track Plan Update

Here is an updated track plan reflecting the as-built track configuration. Some of the structres have been modified from the original plan. The QMD Clinch has been delayed indefinitely due to personal issues, so we will replace it with a barge loaded with forage and other supplies. We will leave a space for the QMD Clinch if it can be built later.

I added a small wharf at the far left. This is intended to help disguise the joint where the  river intersects the left hand backdrop. But, I am concerned that in all the photos I have seen of western rivers,  I have not seen any pictures of a wharf on the river.

If anyone has ideas on how to better treat that area, I am I open to suggestions.

I added the doors and roof to the depot. I still need to add the shingles, chimneys and the platform.






March 24, 2013

Running to the Road Show Depot

Before the run
It was a very early wake up, and a chilly morning for Steve Greene, about 700 others and I,  as we ran the Reston Half-Marathon (others did the full marathon). Steve is a KS fraternity brother from MIT.  He and I had never run a half marathon before, but we both did pretty well -  for two ancient Frat Boyz. I met my personal goal of running it under 2:00 hours, even with the hilly course (about 800 feet of vertical gain).

I was tired this afternoon from the run, so I worked on building the depot for the road show (which involved lots of sitting).  I used the depot at Cairo as inspiration.

I went with painted walls as I was getting tired of raw stained wood on most of the other structures.

I painted the laser cut interior  framing with khaki paint. Most of the interior will not be visible once the building is installed, but I will add some details that might be visible through an open door or window.  Speaking of windows, these  are Tichy parts that now come with very nice laser cut acetate glazing that fits perfectly.
The depot will be a half-flat against the backdrop. Most of the structures will be like this.


Interior structure will be largely invisible

March 23, 2013

Spikes, Staging and Cream Puffs!

We had a very productive work session today. First my mom finished the bunting sections as the last batch of fabric arrived. We put them up for a test of the final look, but we will remove them when scenery work begins.









Then  JB Weilepp, Joel Salmons and Paul Dolkos showed up.  Paul went to work on installing the rail on the ship yard warehouse siding extension, since it was his idea to extend that siding in the first place. I had previously installed the ties, so he just had to spike in the rail.

Fiddle yard in place
In the meantime, Joel was on spiking duty else where on the layout, filling in spikes as needed. Both Paul and Joel discovered that many spikes were bending upon insertion. I had the same problem earlier. I think the batch of carpenter's glue I used to secure the ties is too hard and it was causing the spikes to bend.

JB and I went to work on the staging/ fiddle yard. We built the front wall so that it is removable. It is framed around the perimeter with wood, to stiffen the wall and act as a ...well... frame.  We also added a lateral sky board to the right hand side of the bridge section. This sky board is removable too. Thus,  it can be removed and installed next to the depot section, if Gerry's bridge section is not available. This sky board will get a hole cut in it to allow the trains to pass, but we wont cut the hole until the spackeling I added along the bottom to fill in the gap dries. We inserted a piece of wax paper to prevent the spackling from sticking to the removable sky board.

The staging/fiddle section and side sky board really do a nice job of encapsulating the layout. They really pull the scene together.





JB then started work on converting the O Scale Lou's Cafe to the Post Office. This kit is a styrene building flat. JB removed the third story and added a new cornice. The new cornice uses a crown molding left over from when I built a doll house for my daughter, plus a new dentil trim that I laser cut. He also cut 1 inch wide clapboard walls to give the flat some depth. He promised to bring the completed model back next week.




Removable sky board with future hole for tracks. We have to wait for the spackling to dry. Wax paper prevents the
spackling from sticking to the removable sky board.









Some trees temporarily placed to show how the exit hole will be hidden

The fiddle yard


Joel and JB also volunteered to build flat cars. So both went home with flat car kits that I laser cut.







About half way through the session we stopped for a coffee and cream puff break. These were Italian style Profiterole di San Guiseppe, which are cream puffs stuffed with vanilla custard spiked with Vodka and Triple Sec (we did not have rum). My mom and I had made them on Thursday and we had about a dozen left to eat. They are like little bites of heaven. Yummy!

All in all a great session.



March 21, 2013

No matter how many times I cut it, it's still too short

I installed the tracks on the turntable and lead. Here is a short video demonstrating its operation. It is a manual turntable both in model and prototype. 



The turntable is based on a design used by the USMRR in several locations. Here is an image of one in Alexandria, VA