
There will be a rock cut at the choke point between the tracks. Then the hill will gradually flare to a shallow slope on both sides.
Here is a test train running under the ridge. My wife asked how I will make the hill removable. I don't know exactly yet, but it will happen after the basic hard shell is on. Then I'll cut away the hatches and build up the lip to hold them in place....
or, I may trim away the blue sky board below the ridge. That would allow emergency access from behind and underneath the layout...
or I may just daylight the track for a brief section.
Accokeek Creek

At the far end I added Accokeek Creek. By adding Accokeek Creek, I will have included all the major water crossings from the prototype. This was the site of a 150 feet trestle bridge, but I didn't want to add another bridge, so I plan to install a culvert. Again I'll look to Crozet for inspiration and use a culvert design that he used on the C&O Mountain Subdivision. The white building shows the site of a future water mill. I am looking at several possible prototype structures to use in this spot.
or, I may trim away the blue sky board below the ridge. That would allow emergency access from behind and underneath the layout...
or I may just daylight the track for a brief section.
Accokeek Creek

At the far end I added Accokeek Creek. By adding Accokeek Creek, I will have included all the major water crossings from the prototype. This was the site of a 150 feet trestle bridge, but I didn't want to add another bridge, so I plan to install a culvert. Again I'll look to Crozet for inspiration and use a culvert design that he used on the C&O Mountain Subdivision. The white building shows the site of a future water mill. I am looking at several possible prototype structures to use in this spot.