A journal following the history, design, construction and operation of Bernard Kempinski's O Scale model railroad depicting the U. S. Military Railroad (USMRR) Aquia-Falmouth line in 1863, and other model projects.
©Bernard Kempinski All text and images, except as noted, on this blog are copyrighted by the author and may not be used without permission.
-----------------------------------------------------------------------------------------------------------------------------------------------------------------

January 8, 2012

Ah, Sunny Florida


Top down, visor on, iPod synched - ready to boogie.
There is nothing like a trip to sunny Florida in January. Prototype Rails 2012 is over and I had a good time.  Here are some of the highlights.

A scene on the FECNtrak oNeTRAK layout

The FECNTrak group was present with part of their oNeTRAK layout.  Gregg Stoll, Tom Chaffee and Matt Gatof gave me a run down on their layout and let me operate a train. Their oNeTRAK modules really capture the intent for oNeTRAK when I first proposed the oNeTRAK concept at the NVNTrak Christmas party nearly 15 years ago.

They have some nice modules that combine intense switch districts and open running.

They use balloon tracks at each end of the layout to reverse the trains. They are lucky that their prototype has an actual balloon track in Hialeah, FL that they selectively compressed for one of the loops. They use the other loop as a staging track.

It was appropriate that I got held up at a grade crossing in Melbourne by a 150-car long northbound train on real FEC as I returned to my brother's house on the night I met with the FEC guys.

I went to several good clinics. I especially enjoyed Dave Ramos's NY harbor layout presentation, John Roberts talk on his O Scale C&O layout, both of John Wilkes talks, Jim Lincoln's discussion of prototypical auto rack unloading and Gilbert's Thomas talk on the Tropicana Juice Trains.  I had trouble getting my iPad to project the photos for my talk on my layout update, but everyone seemed to enjoy the talk nonetheless. My make-and-take class was small but the students all did great jobs. The meet organizers asked if I could return next year to do it again.

On Sunday I visited John Wilkes and Tom Wilson's layouts on the west side of Florida before flying out of Orlando. They are both super nice guys and it was pleasure seeing their layouts. Both have impressive double deck layouts. I believe that mountain railroads are well suited to double deck layouts as the frequent tunnels and hills allow one to hide much of the infrastructure necessary in a double deck layout.

John used aluminum C Channels for his benchwork and thus his layout seems to be built to Hadron collider level standards. His track work is very nice with over 100 hand laid turnouts. His scenery is also coming along nicely. It is a complex layout, with two helices and two railroads running parallel to each other with some shared track.  But he has generous aisles and it all feels just right. I got to run a test train and I look forward to returning for a real op session.

One of three operating areas  on John's layout.  His scenery is progressing nicely. He specializes in highly detailed
and accurate coal tipples.

A scene on John Wilkes layout. He models the L&N and Southern where they share trackage.
He uses Florida native lichen to make his realistic trees.

Tom's layout is chock full of interesting structures. His upper deck is primarily devoted to a steel mill which was featured in my steel mill modeling book. I had a chance to operate it a few years back and it is a hoot. The lower deck is more rural WV and PA scenery. Tom gives me good ideas for future steel mill related projects and we may have some new items coming out soon.
The Brass Monkey Bar - where workers go to flush the monkey?

A little photoshop fun with some of Tom's cool mill structures.



January 5, 2012

Prototype Rails 2012


 I'm off to Prototype Rails 2012 in Cocoa Beach. I will be doing an update on my layout at  9:00AM on Friday, 6 Jan.

Later that afternoon I'll be doing a make-and-take class on how to build an HO scale rooftop water tank kit that includes both laser cut wood and photo-etched parts. The photo at the right shows the water tank kit installed on Paul Dolkos' HO layout. Others have used the kit on O scale layouts too. The kit is available from Alkem Scale Models for $24.99

If you are coming to the make-and-take, bring your tool box and a pencil soldering iron. I'll provide the kits and solder. The fee is $25.00.





January 4, 2012

One Does Not Simply Walk into Mordor...


This is for those of you that thought that the rock face looked like Mordor.  I always thought Middle Earth would  make  a neat setting for a Lord of the Rings inspired model railway. They didn't have steam power in Tolkien's world, so you'd have to come up with some other form of motive power. Water powered cable railway maybe?




January 2, 2012

Sisyphean Labor?

Unlike Sisyphus, I am nearly done with my rock work. I ran out of  Durham's water putty or I might have finished tonight.  Another night or two of of mudding and the basic terrain will be done.  That will be a relief.

Once the rock face at Brooke was dry, I painted it with a base coat of acrylic paints. I do the dark colors first as I like the extra contrast it gives me. So I use a mix of  Black, Burnt Umber and Spice Brown to paint in the whole rock face, making sure I get the crevices completely covered. It can be tricky to get the cracks fully colored with the dark paint.

Once that dries, I will add the highlights and mid tones using a mix or spice brown and a touch of white. You have to be careful when lightening red based colors to avoid a pink look.

This reminds me of a story. I was carving rocks for a friend on his layout. He is very particular. I was using prototype photos to copy an exact scene. It was progressing well. When I got to the shadow painting phase he freaked out because he thought I ruined them. Anyway, it worked out as acrylics dry quickly and I finished the painting.

A couple more cans of Durham's water putty and the rock carving will be done. I think the layout room will undergo a transformation when I get all the base scenery and fascia painted the base color.
Rock faces on the tunnel portal.
An N scale locomotive? What the ding-dong is that doing there? Checking clearances?
Nah, I'm just fooling around.


I redid the terrain in the area where Gerry was working on Saturday to reinforce the track and road bed
under the turnout. It is now hot glued to a layer of pink foam, braced underneath and is much sturdier. 

I gave the finished rock face at Brooke a coat of black, burnt umber and spice brown
acrylic to paint in the shadows.Once that is dry,  I will
paint the medium and highlight colors.

Why the reference to Sisyphus other than the obvious rock work connection? I have been known to start layout projects and get about halfway through, then rip them out or sell them and start all over. But this layout has been different. I hope I will actually complete it.

It has taken me several years to realize what I like and can achieve in a model railroad. This layout seems to meet my interests the best. It is also pushing me to learn new skills in scratch building, and engine tuning.  I have reached a model railroad Nirvana of sorts, though there still are many challenges ahead, such as scratch building engines, battery power control,  model ships and the big waterfront scene - saving the best for last.

Some of my friends are still struggling with this issue as they tear out and modify layouts, or can't even get started. Marty is documenting his machinations on trying what to model on his blog. Check it out when you get a chance.

Hard shell and rock carving

Gerry Fitzgerald stopped by for a work session on the afternoon of New Years Eve.  He worked on fixing some loose scenery by Potomac Creek siding as well as spiking some more rail. I worked on adding hard shell and rock carvings.

We decided that the rock carving process was interesting and worth making into a video tutorial. You can see the 12 minute movie below.

Adding hard shell to the hill behind Brooke. Gerry Fitzgerald Photo
I have to use a step stool to reach the deepest parts of the scene. Gerry Fitzgerald Photo
Using my Sawzall to cut the fascia back a bit. It made quick work of the job. Gerry Fitzgerald Photo




Gerry worked on fixing the scenery by Potomac Creek. Gerry Fitzgerald Photo