A journal following the history, design, construction and operation of Bernard Kempinski's O Scale model railroad depicting the U. S. Military Railroad (USMRR) Aquia-Falmouth line in 1863, and other model projects.
©Bernard Kempinski All text and images, except as noted, on this blog are copyrighted by the author and may not be used without permission.
-----------------------------------------------------------------------------------------------------------------------------------------------------------------

May 7, 2013

Scenery Continues...

Haupt inspects the new scenery


I did a couple hours of scenery work tonight. I added a second layer to Biscuit Run. This included various colors of ground foam, chopped up twigs, more patches of dirt and static grass. I added a few trees in the background too.  A few more, better detailed trees are required for the foreground.  Biscuit Run is almost done except for some trees, the burned dock, and what ever other details Gerry wants to add.





















Wet scenery on the Shipyard section


I continued to the shipyard section where I added ballast and the base coat of texture.Then I worked on the trail along the foreground that leads to the site of the future marine shipways by adding static grass, twigs, and muddy ruts on the trail.

I really am enjoying building this green scenery. The winter colors on my layout were getting tiresome, though I think I do prefer the winter scenery overall.








Last week I received a sample of Microtrains N Scale ACW era cars. They are very finely done.

I must admit that after working primarily in O Scale for the past 4 years, I had trouble getting the N Scale wheel sets back in their trucks as some popped loose in shipment. But I eventually got them seated. I posed three of the box cars on one of my flat cars.

At some point, I plan to try a small N scale diorama with these items and some of the other cool stuff that GHQ, Atlas and other manufacturers offer in N Scale.

May 5, 2013

Cassette Staging, First Scenery and a New Name

Bridge over Biscuit Run just before entering staging
Gerry Fitzgerald came up for a work session today and we got a lot done.  Gerry painted the front panel of the staging yard, the fascia and valance with a fresh coat of Union Blue. We will have to touch the paint up one more time after the basic scenery is done, but the finished look of the painted surfaces really helps give the layout a professional look.

Removable Cassette
Entrance to staging needs to be hidden by trees.
The path was a happy accident made by dragging a finger through
wet scenery. 
While he was painting, I went about building a removable cassette staging track. I did this instead of just a fixed fiddle track because I realized that having to pick up the loco every time it came into staging to turn it around was not good for the loco. With this design we can pick up the whole train (4 cars plus loco) on the staging section and turn it around. If we want to add a few more cars, the loco can enter the layout while the additional cars are added to the end. The task of building the cassette was made easier by the fact that with battery power, there was no need to power the rail. We also used flex track to simplify things. We do plan to add a recharging track in the staging section to charge engine batteries.

Base coat of scenery
With the cassette glue drying, we started adding the base coat of scenery. Gerry sifted a big bucket of Utah dirt that we used for ballast and base scenery coat. Then we added a little ground foam to add some color.

After dinner, we hooked up the static grass machine and added a first coat of static grass. Then we cut in the dirt path on the Biscuit Run section, added a few Woodland Scenics trees as view blocks and the posts for an abandoned fence. The idea is that soldiers have removed the rails, but left the posts.

Finally we spent a bit of time fleshing out the story to the layout. So far we knew it was somewhere on the Tennessee River, but we want a better description for the show.

Here is a brief summary. Gerry will work on the full story.

It is the summer of 1864. Sherman is fighting south of Chattanooga toward Atlanta, but Atlanta hasn't fallen. This is a freelanced line that went west-south-west  from Nashville to Bentonville (a fictional town), a small steamship port on the Tennessee River. The town had started the line but had not finished it by the start of the war. The USMRR completed the line in 1863 to act as a back-up route to supply Nashville.  They named the port McCook's Landing in honor of Brigadier General Robert Latimer McCook, who died in 1862, allegedly shot by rebel guerrillas while he lay wounded in an ambulance (though the story is disputed by Confederates).

The town had a small shipyard and various other structures before the war.  It was not burned by the either side, except for the railroad bridge and some farms of suspected guerrillas along the river. The USMRR rebuilt the bridge with a standard design, expanded the wharves and warehouses, and added earthworks with artillery.





May 2, 2013

150th Anniversary of the Battle of Chancellorsville

This weekend marks the 150th Anniversary of the Battle of Chancellorsville. There will be a series of events including a battle reenactment on some of the actual historic battle ground. More info about the event can be found here. I do not plan to attend due to other commitments.



I also learned recently of a new book coming about about the Army of the Potomac winter encampment along the USMRR Aquia Line. The book is called,  "Valley Forge" 1863: 93 Days That Saved America" by Al Connor. I have not read the book but reviews of lectures based on the book indicate that Connor describes the rebuilding of the Army over the winter under General Hooker as the key component to ultimate success of the Army of the Potomac. I look forward to reading it.

April 28, 2013

ProRail 2013


On Wednesday I drove to Northwest New Jersey to attend ProRail 2013. ProRail is a group of layout owners that focus on prototypical operations. They hold an annual get together at varying cities to operate layouts. It started with Chicago and Kansas City and has spread to other US cities. There are many such groups in the US and Canada. They spread by word of mouth. Chances are if you have a serious operating layout, you know of this or some other round-robin operating group.

For Prorail 2013 I operated on Tom Piccirillo's  O scale Somerset County Traction Company, Harold Wertheim's HO Scale Erie, Perry Squire's HO Scale Pittsburg, Shawmut and Northern and had a brief run on John Rodger's On2 Sandy River and Rangely Lakes RR. All of these layouts are basement filling empires with exquisite scenery, good running trains and interesting operations.



A special shout out to Perry Squire's PS&N layout which ran flawlessly with excellent sound.  It is especially amazing given that he runs tiny 1920s era steam engines.  For example, check out this video clip of a 0-6-0 operating in St Mary's yard on his layout.

Tom's layout also ran extremely well utilizing overhead catenary wire for power! Here is a link with more info on Tom's layout. This layout is also complete, an amazing accomplishment given the size and detail he has included.
Tom stands near the ferry terminal at Lambertville.

Harold Wertheim's layout has been featured in several national magazines. It is a vast layout spanning multiple levels and rooms. It absorbed 20 plus operators with no trouble. A highlight of this visit was a chance to chat with Harold. He is now 91 years old and doing great. Keep it up!


John's Rodger's layout is a relatively new
(L-R) Dave Adams, Jim Kern, John Rodgers
project and he has made amazing progress. His layout features a fine collection of brass On2 engines and cars as well as a standard gauge Maine Central RR that interchanges with the SR&RLs.

Like most O-scalers John has a complete metal shop with lathe and milling machines. Tom Piccirillo has an even more extensive shop, but that is somewhat to be expected as he is the President of Micro-Mark, a hobby tool specialist company. I guess you can't be an O Scaler without a metal shop.

One of the best parts of a weekend like this is the socializing that occurs in the hotel and over meals. It was great to catch up with many friends.  It is amazing how friendly and generous model railroaders can be.

I was especially gratified to hear many people say they enjoy this blog. If you are a regular reader, please join the list of followers and don't be shy to comment.

I delivered the coal dock model to Ted Pamperin. He was very happy with it. Several others commented on how much they liked it and I got orders for a couple more.

Finally thanks to all the hosts and helpers for running a great weekend.

My Prorail weekend was bookended by visitors to my layout.

On Tuesday, Milt Martin from Austin, TX,  and my brother Rob visited the layout. Milt is not a model railroader, as he enjoys car restoring and collecting guns. He had a chance to try the layout.  He said he may try some model trains after the visit. Lets hope we have a new convert.
Marshall with Whiton pushing cars on the nose.

On Sunday, Marshall Stull from Michigan visited. He is building a small HO Scale layout depicting Illinois Central in the Mound City, IL area. You can find more about it here.

I gave Marshall a switch list asked had him do an op session on the Road Show. He spent about 45 minutes working the layout. He used the front draw bar on the engine to do some switching as he started where Chuck, Keith and Jack left off last Monday and the engine was facing east with a cut of cars behind.   I did not tell Marshall about the rule regarding  the front coupler bar, so he went ahead and used it. It worked well. It tends to have trouble on tight curves, or long cuts of cars, but on this layout works pretty well.

Overall the road show layout worked well, though we noted that the engine derailed on the west crossover. This is the second instance of a derailment there. In examining it we concluded that the guard rail to the frog was not long enough. I added a section of guard rail to extend it and it worked flawlessly after that.


April 22, 2013

ProRail 2013 Test Operation Session

The live steam railroad uses 7 1/4 inch track to simulate a 2 foot narrow
gauge prototype. So it is about one third scale, big enough to ride in
the locos and cars.
This evening Paul Dolkos, John King, Chuck Hitchcock, Keith Jordan and Jack Ozanich visited the layout.  They are in town for  ProRail 2013. The actual ProRail is taking place in New Jersey next weekend, but a few folks came to Washington for preliminary operation sessions on some of our local layouts.   I will be heading to NJ on Wednesday to participate too.

All the visitors  but Jack Ozanich had been here before. It was Chuck Hitchcock's suggestion to use the magnetic pins in the couplers way back in April 2010.

All these men have extensive model railroads, most are nationally, perhaps internationally known.  Keith and Jack actually have two.  Keith has a website for one of his layouts, the Patch,  here/ The Patch is similar in scope to our Civil War RR Road Show.

Jack has a wonderful HO layout in his basement, and a magnificent live steam railroad outside on his fifty acre wooded lot.  The photos at the left, which I took in 2003,  show some scenes on his outdoor layout.

The round house is fully operational with elevated tracks for maintenance on the locos.  Jack has operating sessions on his outdoor layout where they use the railroad to haul fire wood to the house for heat.  Jack is a retired railroad locomotive engineer. He is also a civil war history enthusiast.

The turntable is fully operational, as are the engine house stalls.



This trestle is about 10 feet high at the deepest



















Watching the intro video
Back in Virginia - After watching an introductory video on the Aquia line and a layout tour, I put them to work operating the Road Show Layout.

I had made up some paperwork earlier and pre-staged a five car train on Biscuit Run. The paperwork is based on actual USMRR documents.

The first paperwork used on the layout. We'll save it for prosperity.
Chuck took over as conductor, with Keith as the engineer, and Jack as the brakeman.

The three man crew worked quite well. The paper work was new to Chuck and it took him some time to get used to it. By acting as conductor he was able to study and concentrate on the paperwork and decide how to do the switching. I made the switch problem a little harder as they had some sorting to do and had to do a facing point pick up.
To set the stage, I provided some telegraph messages that annulled the schedule and told them to run extra from Biscuit Run to Columbus Landing.

The schedule was annulled due to notional enemy activity cutting a bridge further down the line. But the switching problem will be more interesting if we have scheduled trains to consider while working the terminal.

Jack did a great job as brakemen with the link and pins. He got the hang of it right away.

The Stanton throttle is a little quirky, but Keith got used to it quickly. After about 15 minutes they were operating like the real pros they are.  It was very entertaining for Paul, John and I to watch them work. All in all a good session. The layout provided these very experienced operators about 30 minutes of fun.  It bodes well for future op session on the road show.

The crew hard at work

A few other lessons learned from this session. The operators really need to reach into the layout to work the link and pin couplers. So it will not be a good idea to put delicate models between them and the tracks. The steamboat comes immediately to mind. If we do add the steamboat, it should be removable for operation sessions. A low lying barge may be a better model for that reason.  Before the session, we should give the operators a short lesson on how to use the various items. The link and pins, throttle, switch stands and even the paperwork are very different from what most model railroad operators are used to. Perhaps a short video might be a good way to avoid us having to say the same thing over and over as visitors try the layout. The three man crew worked well, but a two man crew could also work. Since you need two hands to do the link and pins, you need a place to put the paperwork, if you will be conductor and brakeman. The engineer should probably not take a second task. So a minimum crew will be an engineer and conductor/brakeman.