December 30, 2011

Layout Visitors and Prototype Rails

 Work progresses, but it's too messy to show to the public. In between slinging plaster and making a huge mess, I had some very nice visitors this past week.

John Drye points out some detail at Stoneman's Switch to his niece, Sarah.
Ben and Katrina, my niece and her boyfriend, check
out the layout on the day after Christmas.



Fred and Helen posing by Potomac Creek. Fred and I were fraternity bros at MIT. 
Next week I will be traveling down to Cocoa Beach to conduct two seminars. One on how to solder brass kits and the other will be a layout update on the USMRR Aquia Line. Here is a link to the clinic schedule. If you plan to be there, please stop by and say, "Hello."

December 26, 2011

Aquia Line - Layout Trailers


Coming soon to a basement near you.....





Once more, this time without using the iMovie template.





.... OK, but maybe if I stop playing with iMovie and my new iPhone 4S I will finish my layout.

December 25, 2011

Merry Christmas

Soldiers not actively campaigning celebrated Christmas in several ways. Union soldiers
would use salt pork and hardtack to decorate Christmas trees. Here workers from the railroad visit with soldiers to admire their tree.

December 24, 2011

Dirty Job 161


Where is Mike Rowe when you need him? I slung some water putty, white glue, and fast and final spackle on the layout tonight. The objective was to get the dam scene surrounded with basic scenery so I can paint it and then get the mill placed. Then final detailing can begin.


First I taped over the Easy DCC control panel with masking tape to keep glue and water putty off it.  I also taped over the tracks to keep the mess off them.


Then I  added a layer of rosin paper soaked in a 50-50 mix of white glue and water to the existing cardboard and rosin paper sections. These strips were to reinforce the paper and webbing at Dolkos-Weilepp Cut, which was a little loose.

Then I added a layer of heavy duty paper towels soaked in a soupy mixture of Durham's Water Putty, water and a heavy dash of white glue.

Once this is dry and the putty set, I'll check it for mistakes and glitches. I'll fix any problems and then add the base dirt layer.  The areas where the ditches touch the wood roadbed  will probably need some additional work.

On the areas where I had a pink foam base, I used fast and final lightweight spackle to fill in voids and correct the terrain shape. Lightweight spackle works very well will the extruded foam.

December 22, 2011

Water Wheel of Fortune

Work continues on the mill. I finished the basic structure except for the roof, a few doors and some hatches that must wait until I install the wheel.

Near finished mill with tail race extension installed. I still
need to paint the stones, add the roof and some other details.



Water wheel with NBWs installed. I used a half- inch
wood dowel for an axle. 
I laser cut the parts for the wheel and on the second try got a design that worked. I went with a 16 foot wheel (4 inches in O Scale), which is close to the wheel in the photos of Piney Branch Mill.  The size of the wheel required an extension of the foundation. I kind of expected that, so it was no big deal. I didn't spend too much time cleaning up the seams as it will be nearly impossible to see once the mill is installed.


There was a lot of trial fitting, trimming scenery and mocking up to fit the dam. Once I was happy with the layout, I installed it with hot glue.  I made the dam 5 inches tall so that it hides the seam in the back drop. That solves that problem.

I cut sheets of Plastruct G-Scale Dressed Stone sheet to cover  the dam, spillway, and head race opening.

I roughly followed the arrangement of the dam and head race with wooden sluice from the Yates Mill.  It works well in this location. This  web site  has some good photos of Yates Mill, as well as hundreds of other mills around the world.



Laying out the dam and spillway.
I masked off the backdrop and gave the dam a base coat of desert tan. I'll have to paint the final colors  in situ.




The dam is now covered with stone. The wheel and head race opening line up.
After thinking about this, I decided to add an extension on the left of the
head race to separate it from the spill way.



Spillway and head race now separated by a stone extension. The spillway
should probably be bigger, but I am limited by the overall width
of the valley.  I'll probably add a diversion pipe to the
dam at the base.  Some photos of Yates Mill show such a pipe. It
would be used during floods to increase flow to prevent overtopping the spillway.




This is the view from the operators' aisle.  The roof is temporary.