A journal following the history, design, construction and operation of Bernard Kempinski's O Scale model railroad depicting the U. S. Military Railroad (USMRR) Aquia-Falmouth line in 1863, and other model projects.
©Bernard Kempinski All text and images, except as noted, on this blog are copyrighted by the author and may not be used without permission.
-----------------------------------------------------------------------------------------------------------------------------------------------------------------

December 7, 2016

It's Just Boxes

I recently started a new custom model project for a client. It is due in 3 weeks, so I am cranking on it. I'll post some pictures of it when I get further along. It is a different kind of model that I am used to, so I am curious on how it will come out.

So while the paint and stain on that project are drying, I got to tinkering with track plans for layouts in the rest of my basement. This particular bout of track plan frenzy is due to a discussion I had with Henry Freeman last weekend. He was in town for a symposium at the Newseum, as he is retired, well-known newspaper editor and publisher. He stopped by the house to operate PoLA. Unfortunately, my DCC system decided to act up during the session. Both of my RF1300 throttles died in the middle of the session. I was able to get one of the new T1300 throttles in service, but by then the evening devolved into a layout planning session. Henry is a serious model railroad operator who leans to preferring layouts with heavy ops more than scenery. In his eyes, the Aquia Line is nice to look at, but lacks in play value.

After he left, I toyed with some plans that would increase operation potential in my basement by expanding PoLA into the rest of the unfinished basement, leaving the section of the Aquia Line from Brooke to Falmouth intact.


The first plan I drew included an attempt to model one of the container terminals on PoLA (see upper plan at left). This was really a force as trying to fit in even a small container terminal in the space I have available was tough.  In addition, the need to buy several sets of double stack cars, associated motive power, and containers would add nearly $3,000 to the cost of the layout.

As I discussed this rough idea with some friends, I realized that the container trains add very little play value to the layout, especially  given their expense. Even when we railfan, my friends are wont to say upon seeing a stack train, "Oh, It's just boxes."

The question is, can a layout that omits container traffic be an accurate model of PoLA? I say why not.  Instead of actively modeling container terminals and container trains, the layout depicts them as images on the backdrop. Without container traffic, the layout focuses on the 40,000 non-container cars that PHL handles each year (compared to 1.2 million double stack container cars per year).

That is the next plan you see at the left. This plan includes a compressed rendition of PHL Berth 200 yard, and several industries on Terminal Island that require rail service  but are not container based.

It includes a scrap metal facility, since scrap is one of the largest US export products and there are two scrap piers on Terminal Island. It also includes a second Vopak facility, a Del Monte Foods factory (which may no longer get rail service) and one additional warehouse that is freelanced.


The plan includes a near scale sized model of the Badger Ave Bridge, which was once a pair of rolling lift bascule bridges, but is now a large vertical lift bridge. That would be a signature scene on the plan.

The plan connects the Berth 200 yard to Mormon Island, but from the "wrong" direction.  Not much I can do about that. However, the staging tracks in the closet can now represent the Sen Pedro district thereby creating a transfer run job from Berth 200 yard to San Pedro.  I looked at a escape track through the peninsula backdrop that connected Mormon Island to Berth 200 without crossing the Badger Ave Bridge (see the upper plan), but decided to remove it in the interest of simplicity.

Other jobs out of Berth 200 yard include the Terminal Island Dock Switcher and the Mormon Island Dock Switcher.  The Terminal Island job and the Mormon Island job would be ready to leave Berth 200 at the start of the op session. During the session the Berth 200 yard would get transfer runs from staging. Then the yard crew would make the trains for the next session.

In addition to the two Dock Jobs mentioned above, the yard could create extra jobs that include a slab train for Pasha, and military trains, wind mills and transformer loads for CMT. Right now wind mill and transformer cars have trouble with the tight curve in the under-stairs staging track. Keeping them away from that area would be good.

So what to do? I envision two Options. Option 1 is to build Aquia Landing as planned, keeping the Mormon Island layout as is, at least for a few years. Option 2 is to Expand PoLA into the place where Aquia Landing would have been, leaving USMRR intact from Brooke to Falmouth. To maintain operational capability on the USMRR I would add a simple staging track in the HVAC closet.

Both options appeal to me. To better understand the options I made a G&D Decision Matrix. This is a bit different from previous analyses I have done because now the matrix compares the scores from two pairs of layouts instead of each layout as a standalone.



A couple things pop out from inspecting the matrix.  One, the two options are very close in sum of  scores, with Option 2 just barely edging out Option 1. However, Option 1 wins when considering the sum of scores with weighted priorities. The main discriminating differences  between the two pairs of layouts are the better waterfront area in Option 1, compared to the extra bridge in Option 2.

Interestingly, the enhanced operations of the expanded PoLA layout are somewhat cancelled by the reduced operational options offered by the smaller USMRR.  Option 2 gets extra points for having an interchange with more than one RR, and an engine terminal, but loses a point for awkward staging in the HVAC closet. The rest of the factors wash out as one layout gains what the other loses.

So the analytics don't point to a clear answer. What does emotion say? Alicia says Aquia Landing has more cool factor, but she has no real preference either way.

I suspect that expanded PoLA could be put into service faster than Aquia Landing since one uses commercial track, while the other must be hand laid. The ships on Aquia Landing will also take some time.

Anyway, I'll have plenty of time to cogitate on the course of action as I finish up the custom job before Christmas.




November 29, 2016

Abraham Lincoln Library and Museum



Steve Wilson with 2 of the 3 dioramas that will be on loan 


This evening Steven Wilson from the Abraham Lincoln Library and Museum at the Lincoln Memorial University Library in Harrogate, TN, stopped by to visit the layout and pick up some of my dioramas. The dioramas will be on display for the next two years at the museum as part of a new exhibit on technology in the Civil War. I'll post more information about the display when it is ready in a few months.




While Steve was visiting, we ran a few trains to demonstrate the Aquia Line layout. Steve is not a model railroader, so he had a lot of questions about the hobby.

Last week my brother and his wife visited us from their home in Florida. We played a lot of golf and ate lots of good food. Nonetheless, I managed to get in about 15 minutes of rail fanning as the Whiskey Creek Golf Course is adjacent to the B&O Old Main Line near Ijmansville, MD.


CSX Autorack train heading to Baltimore with about 50 loaded auto racks passes Mussetter Rd in Ijmansville, MD

November 20, 2016

The Grand Tour

I had a few minutes to railfan and got this shot of a coal drag heading to Texas at the BNSF yard in Denver..


The three hooligans on Top Gear are not the only guys doing the grand tour this month. In the past two weeks I visited 6 layouts in two states a thousand miles apart.

We found some young operator's on Pat Lana's layout
The group poising in Jim Frenec's C&S layout
One of the great scenes on John Parker's amazing layout
 The tour started in Denver where Alicia, Danica, Adam, and I visited three great layouts in the Metro area. They were Pat Lana's N Scale Crandic, John Parker's BNSF Fall River Division and Jim Frenec's Colorado Southern. All there were great layouts with gracious hosts.

We had a chance to meet Pat's operating group and have lunch with them.


At John and Jim's layouts, the layouts were not being operated, but they were kind enough to give us a detailed tour.

One thing is sure, they have some great layouts in the Denver area. I look forward for a chance to operate some of them.

Later in that weekend I had a few moments to railfan while having lunch at the Blue Moon Brewery. I was just in time to see a BNSF west bound coal drag.













After a short week home, I traveled to western New Jersey with Paul Dolkos to operate on some great layouts as part of the Northeast Interchange (an informal group of layout operators that alternate round robin op sessions in NJ and DC-MD each year).

Ted Pamperin and his wonderful layout
The first was Ted Pamperin's wonderful C&O New River Subdivision layout. I got to run a H-4 2-6-6-2 Helper to Alleghany and back to Hinton. This involved the classic dance at Alleghany with shuffling the caboose and turning the engine all under CTC control. Then  I ran an H-7 2-8-8-2 with a train load of armored vehicles (see video). That was a treat.

Ted's layout is chock full of wonderful steam engines and great scenery.

Night Ops on Dave Abeles layout
The next day I operated on Dave Abeles's Conrail Onondaga Subdivision. This layout aims to capture the feeling of high volume and high-speed operations on Conrail in the 1990's.

Dave and all his helper crew are professional railroaders on NJT, LIRR, or AMTRAK in various capacities. They are also a young group and have embraced all kinds of modern technology such as wifi throttles, remote dispatching (the dispatcher in the first half of the session was located in Philadelphia), full bi-directional CTC on a double track main, photo printed backdrops, and night time operations. It was an intense and fun session. I got to dispatch in the afternoon with lots of help from Chris Lee.

Triple Meet at Sparta Junction on Jerry Dzeidic's layout




On the last day I operated on Jerry Dzeidic's Susquehanna RR. It is a large double deck TT&TO layout. While there is little scenery, what is complete is well done and the unfinished sections are neat and well built. The layout ran great. Travis Stavac and I ran a way freight that was a lot of fun. Through a blunder on our part, we managed to create a "first"- a three way meet at Sparta Junction. I guess Jerry's warning during the morning briefing to "not meet at Sparta" fell on deaf ears.

It was a fun weekend punctuated by the first snow fall of the year. Weekends like these reinforce what a great hobby  with great people we have.


Paul helps clear the first snow off the Alkem-mobile while still on summer tires. Luckily the temps were warm and the snow quickly melted.


October 22, 2016

The show must go on

Strong depot on Lou Sassi's On30 layout
The Tracks to the Triangle MER annual meet is drawing to a close. It was an extremely well run event and I had a great time. I want to thank Jack Dziadul and his crew for inviting me, and providing great support during the meet.

Lou Sassi host an open house for his beautiful On30 layout.
I got to tour four layouts, attended several clinics, and presented 3 clinics myself. I also did the key note talk at the awards banquet. Unfortunately, throughout the weekend I suffered from a severe case of Laryngitis. In spite of my sore throat and weak voice, using a microphone I was able to get through all my presentations.

I am looking forward to next year's event in Harrisburg, PA. I also learned that in 2018, the Potomac Division will be hosting the meet in the DC area. I better get cracking on getting the  Aquia Line up and running before then.



Will Allen's O scale 3-Rail harbor scene on his Duckunder Terminal Railroad

Coal mine scene on Will Allen's layout. 

We had a mini Porsche Paddock in the hotel parking lot as
Charlie, Hank and I  drove our Porsches to the event. (Hank's car is behind me and not in the photo)

October 18, 2016

New Products Announced at the 2016 ACWRRHS Meet

In my previous post I failed to mention that Dave Schneider of SMR trains announced a bunch of new products in O and HO scale. Dave Bright also announced a new book he has written on the Confederate's capturing  and transporting locomotives and cars from the B&O and ALH RR's.

SMR Trains has some of the products already posted on his website. Others will be forthcoming. The first products for sale are laser cut O scale box cars in kit or RTR form.  See the image below.


Next on tap are O scale figures, tools, artillery, and other impedimenta.  He also showed the prototype for models of the Lee-Brooke Gun in O and HO scale.

Dave Bright's new book will be out in a few months. It is a detailed look the facts behind the great locomotive caper and Thomas Sharp's role in it.  Check his web site for more details.