A journal following the history, design, construction and operation of Bernard Kempinski's O Scale model railroad depicting the U. S. Military Railroad (USMRR) Aquia-Falmouth line in 1863, and other model projects.
©Bernard Kempinski All text and images, except as noted, on this blog are copyrighted by the author and may not be used without permission.
-----------------------------------------------------------------------------------------------------------------------------------------------------------------

September 16, 2022

Backdrops at Falmouth - Alicia approves!

 

It really is amazing what a backdrop does for the layout. I spent today painting and making cut outs for the backdrop at Falmouth.  

One of the key objectives of the backdrop was to show the Phillips House on the hill behind Falmouth. It was slightly north and east of the station. Gen Burnside used it as his headquarters when he was in command. Gen Hooker had his HQ near White Oak, so unidentified soldiers used Phillips House for their quarters. In February 1863, one of them started a fire in a hearth that accidentally spread to the rest of the house and it burned down. A photographer showed up and got a photo of it the next day.  I used that photo to make a cutout of the house and placed it on the backdrop.  I painted a road that leads to the house. I also used a cutout from Brian's artwork to show some of the servants quarters that were reported to be near Falmouth Station.

The burned station and the rest of the structures are recycled from the original Falmouth.

I also used some of Brain Kammerer's artwork to show the  army camp south of the Falmouth warehouse. 

I suspect there is about one more man day of work to finish the backdrops.

Alicia checked the layout tonight and said, "this is better than the port layout." I guess that is a good sign.

Brian's artwork was perfect for this spot south of the QM warehouse. I borrowed the lone pine from the rest of the layout. Making more trees is job one the do list.



September 15, 2022

First Layer of Scenery on Phase 2


 
Test shot showing the first layer of scenery. Auto focus bracket stack shot with the R7 with in-camera blending. I used PS to add the smoke and remove the window. 


First section to get ground cover
I started adding scenery at the north end of the bridge and will work to the south toward Falmouth. The reason I am starting here is that I am still waiting for some urethane rock castings from Scenic Express to be able to finish the tunnel portal area. 

This is the first layer of scenery. I used the dirt, ground foams and static grass in the first layer. Once it is fully dry, I need to decide what details I want to add such as fences, trees,  bushes, structures, and encampments.
With the base layer of scenery installed, I painted some distant terrain on the backdrops. I kept the horizon line low as I don't want this to appear like a mountainous region, just hilly with steep ridges.

I painted some distant detail on the backdrop

 Today the frog juicers arrived, so I will have to take some time to install those. 

September 14, 2022

Ready for scenery and backdrops




 I finished the last terra-forming for the layout.  The low hills behind Falmouth are stryofoam, while the large hill by Stares Tunnels is a cardboard/foam web covered with rosin paper and plaster gauze. 




I ordered frog juicers for all the turnouts at Falmouth.  I don't really need them given that I use battery powered and keep-alive equipped locomotives, except for one spot- the turnout from the arrival track to the rear siding. The front stub track to the turnout to the rear siding is too close to the frog of the turnout right before it. So I cannot cut a gap in that stub rail without weakening it. So that frog and stub rail will need a frog Juicer to avoid shorts when trains use the arrival track.  The battery locos will chug right through despite the short, but the other locos will be affected. Adding frog juicers is simple and really just best practice. 

I am waiting for some additional urethane castings from Scenic Express to finish the rocks by the tunnel. Meanwhile, I painted all the raw terrain and fascia with a coat of Virginia clay red latex paint. The paint really helps the layout look a lot more refined. 

Next comes scenery and backdrop painting, some of my favorite layout building tasks.








September 11, 2022

First Train to New Falmouth

When the glue under the bridge dried, I spent a good part of Thursday installing the rail over the bridge and connected it to the rest of the layout.  It took me about 8 hours to do the work, but I had to take a lot of breaks as I was feeling some mild side effects from a COVID booster shot. But, I was able to get all the track and spikes on this section complete. I figure that I can lay and spike about one foot per hour. That includes 4 spikes per tie.

Friday was a busy day as Amby arrived to finish wiring the bus and feeders and I worked on the scenery at Falmouth. We had an issue with my second booster. Amby thinks the second booster may be shorting the first booster, probably due to a fault in my wiring. Fortunately, the layout works fine with just one booster. I generally run 2 or maybe 3 engines at a time. My two work horse locos are battery powered and they run through shorts and other minor problems. So we should be OK.

With the wiring sorted out using one booster, Amby took the throttle with me as the conductor.  We ran a 7 car train into Falmouth. We used the main line as the arrival track as the arrival track had 3 cars parked on it. Those cars required Amby to make some extra moves to clear the main, get to the turntable, reverse the engine, run around the train. Pick up some cars and head out of town.

Amby was the first operator to OS a train into Falmouth using the telegraph system. Everything worked pretty well as long as the conductor made sure the switches were set correctly. 



After Amby departed, I continued with adding the scenery at Falmouth. Since this part of the layout is a narrow shelf, there is a lot less vertical relief. But I did cut away some of the fascia to provide a hint that the yard at Falmouth is adjacent to the creek.

 

September 8, 2022

Back to Spiking Time


Forty two and a half pounds of weight to hold the trestle while the glue dries


I finished installing and carving rock faces by the bridge site and balloon camp. 

Black base coat on rocks

Next I painted the rocks. I use Durham's Water Putty for my rock carving material. It has a yellow color. So I add brown acrylic paint to the putty mix. But once the putty is dry I paint the whole rock face black. Then I dry brush white from above to create the zenith highlights. At this point the rocks look like a black and white image.



Color Palette

Next, I take dark brown, burnt sienna, medium gray, white, and tan acrylic paint. I brush the rocks lightly with these colors on a wet brush to catch the high points. The brush is not so wet as to run and puddle paint in the crevices. It's a like a dry brush technique but with a loaded wet brush. 

I did a quick job of painting the creek bed. This will be covered with layers of other scenic material so the paint wasn't critical, but it will look like a acceptable before I get to that.

Once the rocks and creek were painted, I inserted the bridge into position. I adjusted the fit slightly by cleaning away any stray bits of putty. Then I glued it with carpenter's yellow glue. I put 42.5 pounds of weight to hold it it position.

Zenithal highlights with white paint



I didn't finish the terrain over the tunnel. That will have to wait until the rails are spike down.