A journal following the history, design, construction and operation of Bernard Kempinski's O Scale model railroad depicting the U. S. Military Railroad (USMRR) Aquia-Falmouth line in 1863, and other model railroad projects.
©Bernard Kempinski All text and images, except as noted, on this blog are copyrighted by the author and may not be used without permission.
-----------------------------------------------------------------------------------------------------------------------------------------------------------------

December 13, 2012

Rail Gun - Finished


I finished up the remaining details on the rail gun. I replaced the coupler on the rear. The first one was too big.  Since I laser cut the parts from 1/16th inch acrylic, it was a simple matter to reduce the height of the center part and and reinstall it. The nut detail is actually engraved. The coupler simply is glued to the wood frame.

The brake wheel hangers were the next challenge. I made the parts from 0.020 inch strip brass, a .042 inch brass rod and an etched brass wheel from my spares box. To fashion the parts I used my drill press with an x-y table to drill holes in a straight line. Then I used a new sharp  file to shape the parts. I secured the parts to the model and then added NBW details with CAA. I added a cast white metal gear to the shaft to represent the locking pinion.  To simulate the pawl, I added a small silver of wood.

I had to use brass for the parts  because the next step involved soldering the brake chain to the wheel shaft and the brake linkage on the truck. With everything soldered up, I tested the brake mechanism. It does work, though it would need some adjustments if this were to be an operating model.

Next I added an elevation wheel to the gun (not visible in these photos). I also mounted a small rod on the bottom   front of the gun carriage and added a wood strip with an iron strap on the rear. This allows the gun to deflect a limited amount in the casement while also tilting the gun forward. The tilt allows the gunners to run the gun out for firing, while the up slope helps absorb some of the recoil.

Next I must build the base to display the gun, and an acrylic case to protect it.




Having studied this gun, I am convinced that it was built solely as a weapon to counter other rail mounted iron clad guns. The heavy 32 pound cannon is impractical as a field weapon against mobile infantry and artillery targets. The limited traverse also hinders its use as a general field piece. The heavy armor only on the front meant that they did not expect it to be engaged from the sides.

To my mind the design of this gun supports Dr. Schneider's thesis that this was the "Dry Land Merrimack" that Lee had Brooke build for the Peninsula Campaign in 1862. They built the gun as a response to reports that the Union were also developing an ironclad  railroad gun. The Lee-Brooke gun was used once, probably found impractical as the Union did not have a matching railroad ironclad, and then retired to a siding, where it was discovered a few years later by Union soldiers.

December 12, 2012

Rail Gun Update

I am almost finished with the Lee-Brooke Rail Gun. Here are some shots showing the model. I attempted to add any detail visible in the two existing photos. Everything on the model except the wheels has been built from scratch.

The iron armor is laser cut and engraved acrylic.
I still need to add the brake wheel and the cannon elevation wheel.  With the brake wheel installed, the brakes will work.

I plan to make a solid cherry pedestal and acrylic case for it to match the existing Dictator mortar model. These will be on display at the B&O Museum next year starting in January.




December 10, 2012

Baltimore Harbor layout


Holiday parties create a nice break from layout work. Making strawberry Santas and cupcakes is
much like making scenery, just more tasty.
On Saturday I assisted Paul Dolkos in hosting an open house for the NMRA. Paul is building a new layout with a Baltimore industrial harbor theme. The layout is about 40 percent complete, though most of the track is installed and operational. My job, along with Bob Warren, was to keep trains running while Paul entertained guests.

Here is a shot showing me switching the Western Maryland car float at Wagner's Point on Paul's layout.  (Photo by Gerry Fitzgerald).


After Paul's open house, Gerry Fitzgerald and Gabriella Petrick visited the Aquia Line. It had been about three years since Gabriella had last visited so there was lots of new stuff to see. It was a fun visit, enhanced with some homemade raspberry vodka provided by a colleague from work.

December 9, 2012

Civil War Ships Models at the Navy Yard Museum

 The US Navy Museum at the Navy Yard in Washington, DC is one of the least known, but best museums in the area. Here are photos of some of the ACW era ship models there.
CSS Virginia in drydock



USS Miami, a double ended gunboat

Mighty Mo!
Probably the most impressive models in the museum are the 1/48th scale aircraft carriers and battleships built by the ship contractors. These are huge and highly detailed.

December 1, 2012

A cupcake too far

Gerry Fitzgerald and Joel Salmons stopped by for today's cupcake, I mean work,  session. Brian and Michele also stopped by after the Scottish Christmas Walk to have a cupcake and check the  progress. Last, but not least,  Doug Gurin, the now famous Model Railway Show podcast personality, stopped by for a status check, plus a cupcake and slice of Gerry's infamous chocolate cake from Charlottesville (too bad most of us are on diets).

Gerry and Joel score and snap the pink foam
Everyone was satisfied with the LED lighting, drapes and bunting. So we moved on to installing the pink foam layer. But first we had to make a trip to Home Depot to get supplies to finish the walls for the staging yard. Little did we know that we also needed fresh tubes of adhesive for the foam. Because when we got back, we discovered that the tubes of adhesive I had on hand were old and seemingly partially set. But, we were able to get enough adhesive to stick the pink foam panels to the benchwork.

With the panels glue setting, we did some mockups with laser cut track templates and a bridge mock-up.


Pink foam installed on the first two sections

Mocking up turnout locations using the mini-mock up as a guide

Weighing down the foam while the glue sets

A laser cut cardboard mock-up of the bridge.